SR. NO | NAME OF THE OILFIELD | CLIENT | PERIOD OF CHARTER | CONTRACTOR’S SCOPE OF WORK |
---|---|---|---|---|
24 | Offshore Mumbai High | DOEIL | Dec ‐2017 to ongoing | Air Diving Construction job at HC |
23 | Offhore Mumbai High | Forbes Bumi Armada / IGOPL | Oct‐17 | Under water Inspection of two FPSO |
22 | Offshore Mumbai High | LTHE | Jun‐17 | DP Accomodation support vessel |
21 | Offshore Mumbai High | Kreuz / ONGCL | April 2017 to May 2017 | Crossing correction at Mumbai High |
20 | Offshore Mumbai High | Swiber/ ONGCL/ LTHE/ Kreuz | Oct 2015‐ March 2016 | Pre‐ Engineering ‐ X Clamp Installation _ Free Span correction at Mubai High |
19 | Offshore Mumbai High | Swiber, ONGC | May 2015‐ June 2015 | Pre‐ Engineering ‐ Riser Installation for PRP4 and C26 Projects for ONGC |
18 | Offshore Mumbai High | Leighton India | 11.12.2014‐ mid May 2015 | Air dive, SAT Dive for redundant riser removal. |
17 | Offshore Mumbai High | LTSOPL / IGOPL | 29.10.2014 ‐ 08.12.2014 | SBM demooring, removal of subsea piplelines, Bow string Installation, riser clam installation using Sat Dive and Air Dive |
16 | Arabian Gulf | Technip France Abu Dhabi | Late June 2014‐Late Oct 2014 | Riser Installations & Grouting operations |
15 | West Coast of India | LWIN , India | Dec 2013‐ mid May 2014 | Riser Clamp Installations on West Coast |
14 | Offshore Oman | NPCC, UAE | End Sept 2013‐ Third week Nov | Offshore Construction work in Offshore Oman |
13 | Offshore Qatar | Workboat International, UA | 2nd Sept‐ 19th Sept 2013 | DP Accomodation support vessel |
12 | Offshore Bombay High | Leighton Welspun India | Nov 2012 –End May 2013 | Installation of Crossings and Free spans corrections. Riser Clamps and Bow String Installation |
11 | Offshore UAE | Technip France Abu Dhabi | Late Sept 2012 to Oct 2012 | Installation of Bow Strings and Sleepers; Pipeline cleaning and disconnection of four |
10 | Offshore Oman | ISEAS , UAE | 06.07.2012‐ 08.09.2012 | ROV Operations, IRM Subsea Support in Offshore Oman |
9 | Offshore India & South East Asia | Swiber Offshore/ Creuz Subsea | April 2011 to July 2012 | Crossings & Free span corrections, Flexible Pipelay installations |
8 | Offshore Western Mediterranean | Rana Diving and Marine Contractors, Italy | 31.05.2010 ‐ 23.06.2010 | ROV Operations in Offshore Libya |
7 | Offshore East coast of Mexico | Condux SA de CV (Protexa), | 03.02.2009 ‐ 26.03.2010 | Subsea survey, ROV Operations |
6 | Offshore Trinidad | Cal Dive Inc, USA | 15.04.2008 to 20.05.2008 | Flexibles Installation, ROV Operations, IRM Subsea Support in the West Indies |
5 | Offshore Trinidad | Superior Offshore | 14.07.2007 to 15.04.2008 | ROV Operations, IRM Subsea Support in the West Indies |
4 | Offshore Trinidad | Offshore Technology Solutions Ltd. (OTSL) | 29.07.2006 to13.07.2007 | ROV Operations, IRM Subsea Support in the West Indies |
3 | Mumbai High North | Discovery Enterprises Pvt. Ltd. (Jindal) | 21st May 06 to 27th May 06 | FPSO Riser hose installation |
2 | Mumbai High North | BG Exploration & Production (I) Ltd. | 2nd May 06 to 21st May 06 | Tie in Installations and survey of 36" Gas Trunk line |
1 | Bombay High | IOEC | 6th Mar 06 to 1st May 06 | RSPM Project for ONGC . This involved installation of Crossings, Freespan corrections & Riser clamp installations |
All Rights Reserved By Seamec Limited.